Thursday, February 26, 2009
Wednesday, February 25, 2009
Tuesday, February 24, 2009
Wednesday, February 18, 2009
Siding
Electrical inspection failed today for a ground and a 50 amp hot tub wire, should all be fixed tomorrow. Siding is working it's way around the house and is looking great. This is the point where everyone tells me it feels like it slows down.
Tuesday, February 17, 2009
Ready for Inspection
Electrician is done and ready for inspection.

Oh....You can always tell when a plumber has been there.
Oh....You can always tell when a plumber has been there.
Rough In Wrap Up
Lots of people have been working on electrical, heating, plumbing, and siding. Some rough in inspections are coming mid week then it's the start of insulation. No major change for pictures. I'll figure out some good picture for tomorrow.
Thursday, February 12, 2009
There is a lot going on.
Main runs in the basement of gas, built-in vacuum, hot and cold water, and heat duct.

Garage door and front door won't be here for over a week. With all the stuff inside it's needed a little security.
Garage door and front door won't be here for over a week. With all the stuff inside it's needed a little security.
Labels:
Garage Door,
Heating,
Vacuum,
Wather
Tuesday, February 10, 2009
Monday, February 9, 2009
Tuesday, February 3, 2009
Random Pictures
Plumbers were there yesterday and today. Here are a few random shots looking in to the great room and the basement.

Labels:
Basement,
Entry,
Great Room,
Kitchen